EV charge point installers in Henley-on-Thames, Oxfordshire, Berkshire & Surrey

7 kW home and workplace charge points, load-managed and cleanly routed.

EV Installation work by Ridgeway Electrical

We install home, workplace and fleet charge points from our base in Henley-on-Thames, covering Reading, Marlow, Maidenhead, Twyford, Oxford, High Wycombe, Guildford and Woking. Every install starts with a supply check: where the main fuse or the existing board can't carry the load, we say so before quoting, and we design in load management rather than pretending the problem isn't there.

What's included

  • 7.4 kW single-phase and 22 kW three-phase units
  • Load curtailment and CT clamp monitoring as standard
  • Tethered or socketed, wall or post mounted
  • Smart charging compliant with the 2021 regulations
  • Cable runs concealed wherever the fabric allows

Charge points we install

Common questions

Which charger should I choose?
We fit Simpson & Partners, VCHRGD and Nexblue units. The right one depends on cable length, mounting position and whether you want solar-matched charging.
Do I need an upgraded supply?
Rarely. Most homes are fine with load management, which throttles the charger when the house draws heavily. We check your main fuse and consumer unit first.
How long does installation take?
A standard domestic install is half a day. Longer cable runs, trenching or commercial multi-bay work is quoted with a set schedule.
Can the charger use my solar?
Yes. Solar-matched charging is supported on all the units we fit, so the car can charge from surplus generation only if you prefer.

Recent work

Henley-on-Thames, Oxfordshire

Georgian townhouse charge point with load management

A tight 60 A supply and a listed frontage. We ran the cable internally through an existing service void and fitted a 7.4 kW unit with CT clamp curtailment, avoiding a supply upgrade entirely.

Output
7.4 kW
On site
5 hours
Supply upgrade
Not needed

Two other firms said we needed the supply upsized. These didn't, and they were right. You can't see the cable run at all.

Homeowner, Henley-on-Thames

Theale, Reading

Eight-bay workplace charging hub

Eight dual-socket bays from one three-phase supply, dynamically load balanced so staff charging never trips the site's capacity. Access control and monthly usage reporting set up on handover.

Bays
8
Per bay
up to 22 kW
Install
9 days

Phased around our shifts so we never lost the car park for a full day. The reporting alone has paid for itself in admin time.

Facilities Lead, Theale

EV Installation across the Home Counties

We install and maintain ev installation from our Reading base across Oxfordshire, Berkshire, Buckinghamshire and Surrey.